<?xml version="1.0" encoding="UTF-8"?>
<!--Generated by Squarespace Site Server v5.9.2 (http://www.squarespace.com/) on Thu, 11 Mar 2010 11:24:38 GMT--><rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd" xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0"><channel><title>Home of the Blankets Creek Mountain Bike Trails</title><link>http://www.sorbawoodstock.org/blankets-creek-news/</link><description></description><lastBuildDate>Tue, 09 Mar 2010 14:23:28 +0000</lastBuildDate><copyright></copyright><language>en-US</language><generator>Squarespace Site Server v5.9.2 (http://www.squarespace.com/)</generator><item><title>Blankets Creek - Work Party this Sat, 3/13 @ 9am</title><dc:creator>Jay Wilkes</dc:creator><pubDate>Tue, 09 Mar 2010 14:15:15 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/3/9/blankets-creek-work-party-this-sat-313-9am.html</link><guid isPermaLink="false">367531:3946913:6953735</guid><description><![CDATA[<p>This Saturday we will be having a work party at Blankets Creek to resolve some loose ends. First, we will be constructing a new reroute at the beginning of South Loop to avoid a permanent trouble spot. This new section will be tight and twisty through a pine grove. After that we will be working on the Dragon's Tail Extension if which two machines will be cutting all morning. The new berms need to be sculpted and general dirt cleanup from the machines.</p>
<p>Rope Mill is still in progress but not enough trail has been cut to call a work party yet. We are wanting to get these final pieces completed at Blankets so major work parties can be focused on Rope Mill after this one.</p>
<p>Bring water, gloves and wear sturdy boots. Lunch will be provided afterwards .</p>
<p>Meet at the Blankets Creek kiosk at 9am. We will break for free lunch at 12:30pm.</p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6953735.xml</wfw:commentRss></item><item><title>Chapter Meeting Tonight (Mon, 3/8) @ Summits Wayside Tavern @ 7pm</title><dc:creator>Jay Wilkes</dc:creator><pubDate>Mon, 08 Mar 2010 20:15:58 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/3/8/chapter-meeting-tonight-mon-38-summits-wayside-tavern-7pm.html</link><guid isPermaLink="false">367531:3946913:6947590</guid><description><![CDATA[<p>Just is case you didn't see it in the new Event Section on the left hand side, we are having our March Chapter Meeting at Summits Wayside Tavern on Eagle Drive in Towne Lake (across from Etowah High School). Meeting starts at 7pm.</p>
<p>&nbsp;</p>
<p>Directions are located on the link under the Event tab section.</p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6947590.xml</wfw:commentRss></item><item><title>It's True</title><dc:creator>Jeff Murchison</dc:creator><pubDate>Fri, 05 Mar 2010 18:58:46 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/3/5/its-true.html</link><guid isPermaLink="false">367531:3946913:6917566</guid><description><![CDATA[<p>Yes it's true all the trails are open, so get out there and ride!</p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6917566.xml</wfw:commentRss></item><item><title>Trail Traffic Counts 2009</title><dc:creator>Jeff Murchison</dc:creator><pubDate>Thu, 04 Mar 2010 02:21:44 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/3/3/trail-traffic-counts-2009.html</link><guid isPermaLink="false">367531:3946913:6901200</guid><description><![CDATA[<p>Here are the numbers for the months we recorded traffic at Blankets Creek.</p>
<p><span class="full-image-block ssNonEditable"><span><img src="http://www.sorbawoodstock.org/storage/post-images/2009-data/2009%20Trail%20Head%20Counts.jpg?__SQUARESPACE_CACHEVERSION=1267669926857" alt="" /></span><span class="thumbnail-caption" style="width: 649px;">Data reached by dividing raw count by 2</span></span><span class="full-image-block ssNonEditable"><span><img src="http://www.sorbawoodstock.org/storage/post-images/2009-data/2009%20Trails%20Combine%202009.jpg?__SQUARESPACE_CACHEVERSION=1267669851322" alt="" /></span></span></p>
<p>&nbsp;<span class="full-image-block ssNonEditable"><span><img src="http://www.sorbawoodstock.org/storage/post-images/2009-data/2009%20Trails%20Compared%202009.jpg?__SQUARESPACE_CACHEVERSION=1267669945107" alt="" /></span></span></p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6901200.xml</wfw:commentRss></item><item><title>Freeze-thaw</title><category>Freeze-thaw</category><dc:creator>Jeff Murchison</dc:creator><pubDate>Fri, 26 Feb 2010 23:58:37 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/2/26/freeze-thaw.html</link><guid isPermaLink="false">367531:3946913:6848081</guid><description><![CDATA[<p>The Chattanooga Chapter has a great write up on what freeze-thaw is and why it's so bad. Freeze-thaw is why Blankets is closed this time of year. Please understand that we get more traffic in one day then most trails see in a month so we have to be very careful with the trails right now as opening them too soon will cause months worth of damage to the trails and only force us to keep them close longer.</p>
<p>From <a href="http://sorbachattanooga.org/wordpress/?p=923" target="_blank">SORBA Chattanooga</a></p>
<p><span class="full-image-float-right ssNonEditable"><span><img src="http://sorbachattanooga.org/wordpress/wp-content/uploads/2010/02/footprints.jpg?__SQUARESPACE_CACHEVERSION=1267229555207" alt="" /></span><span class="thumbnail-caption" style="width: 500px;">This photo demonstrates how even foot traffic during the freeze-thaw cycle can impact the trail long after it drys out.</span></span>Between abundant precipitation and very cold temperatures, off road enthusiasts have been largely kept off their bikes for weeks.&nbsp; After a long cold and wet month many mountain bikers are just itching to ride.&nbsp; The arrival of warmer weather means that many want to head out on to the trails right away.</p>
<p>Most mountain bikers understand riding a trail when wet and muddy can cause rutting, puddling and other forms of trail degradation.&nbsp; However, many of these same users don&rsquo;t understand that trails are at even greater risk during the freeze-thaw process.</p>
<p><strong></strong><strong><span class="full-image-float-left ssNonEditable"><span><img src="http://sorbachattanooga.org/wordpress/wp-content/uploads/2010/02/niker-damage.jpg?__SQUARESPACE_CACHEVERSION=1267229484759" alt="" /></span><span class="thumbnail-caption" style="width: 300px;">This trail has suffered degradation from foot traffic during the free-thaw process.</span></span>What is the freeze-thaw process?</strong></p>
<p>During wet winter months, when the trial becomes saturated and temperatures drop, ice forms in soil voids.&nbsp;&nbsp; Through the night temperatures drop and the freezing process pushes soil grains apart reducing particle cohesion and soil strength and making the soil more erodible.&nbsp; During the day temperatures increase and the trail surface thaws.</p>
<p>Even though the surface has thawed, the ground is still frozen just below the surface. To make matters worse, the frozen ground prevents precipitation from sinking in any further. This means the thawed layer at the surface is absolutely saturated with water so it is very intolerant of any disturbance. Come riding along and you&rsquo;ll cut through the thawed layer right down to the frozen ground. The thawed layer will end up with ruts from the tire tracks, which will persist even when the soil dries out.</p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6848081.xml</wfw:commentRss></item><item><title>Rope Mill First Work Party</title><category>News</category><category>Rope Mill</category><category>Work Party</category><dc:creator>Jeff Murchison</dc:creator><pubDate>Sun, 21 Feb 2010 00:15:46 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/2/20/rope-mill-first-work-party.html</link><guid isPermaLink="false">367531:3946913:6772824</guid><description><![CDATA[<p>We had a great turn out today for the new trail system at Rope Mill. 48 volunteers showed up at 9:00 am this morning and helped get the new trail system started. Here are some photos from the day.</p>
<p>Thank you to everyone that came out!</p>
<p>&nbsp;</p>
<p><span class="full-image-block ssNonEditable"><span><a href="http://www.sorbawoodstock.org/display/ShowGallery?moduleId=3949524&amp;galleryId=323336"><img style="width: 620px;" src="http://www.sorbawoodstock.org/picture/sdc10414.jpg?pictureId=4522026&amp;asGalleryImage=true&amp;__SQUARESPACE_CACHEVERSION=1266711727952" alt="" /></a></span></span></p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6772824.xml</wfw:commentRss></item><item><title>Sorry - We are experiencing technical difficulties...and yes the trails are still closed.</title><dc:creator>Jay Wilkes</dc:creator><pubDate>Fri, 19 Feb 2010 13:51:48 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/2/19/sorry-we-are-experiencing-technical-difficultiesand-yes-the.html</link><guid isPermaLink="false">367531:3946913:6755295</guid><description><![CDATA[<p>Yesterday brought a ton of folks to the trails to ride with a closed gate. The Hotline said it was open...</p>
<p>That's strange, I know I closed it after the snow ride, but sure enough it was my voice saying it was open....strange.</p>
<p>We found out via a message left on the system from&nbsp;our hotline provider that they moved us to a new computer system and for us to double check our greeting message for accuracy. It wasn't. They posted our "open" message by mistake.&nbsp; Dang... Sorry for any inconvenience and confusion this caused.</p>
<p>So the burning questions is still - "When do they open?".</p>
<p>The answer: When they thaw out and&nbsp;then dry out. We still have snow/frozen trail in&nbsp;sections. Yes it will be in the 60s and sunny this weekend and hopefully&nbsp;this will rid the mud.</p>
<p>Thanks for your patience.</p>
<p>Jay Wilkes</p>
<p>Pres- SORBA Woodstock</p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6755295.xml</wfw:commentRss></item><item><title>1st Work Party at Rope Mill Park this Saturday - Feb 20th @ 9am</title><dc:creator>Jay Wilkes</dc:creator><pubDate>Wed, 17 Feb 2010 01:46:53 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/2/16/1st-work-party-at-rope-mill-park-this-saturday-feb-20th-9am.html</link><guid isPermaLink="false">367531:3946913:6718076</guid><description><![CDATA[<p>SORBA Woodstock will have its very first Work Party at Rope Mill Park this Saturday morning. We will be clipping back the limbs and raking/blowing the organic duff off the trail bed. This will allow us to get the trail ready for machines to cut the trailbed. The work party will start at 9am and will commence with free lunch at 1pm. Bring lopers (clippers), hedge cutters (for briars), gloves and water. We will have tools as well for others. Also dress in layers for it being cool in the morning. It should be in the 50s by noon.</p>
<p>Come be part of history on this monumental inaugural work party at the second trail system SORBA Woodstock is building out for MTB use.</p>
<p>Meet at the pavillion at Ole Rope Mill Park in Woodstock on the shores of Little River @ I-575.</p>
<p>Directions to Ole Rope Mill Park from I-575 going North:&nbsp;</p>
<p>Take Exit 8 (Towne Lake Parkway Exit)</p>
<p>Turn right off Interstate onto Towne Lake Parkway</p>
<p>At first light make a left onto Woodstock Parkway</p>
<p>At next light &ndash; make a left onto Ridgewalk Parkway</p>
<p>Make first right (just before bridge) onto Old Rope Mill Road</p>
<p>This road dead ends into the park.<span id="_marker">&nbsp;</span></p>
<p><span>&nbsp;</span></p>
<p><span>See you there!</span></p>
<p><span>Jay Wilkes</span></p>
<p><span>Pres - SORBA Woodstock</span></p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6718076.xml</wfw:commentRss></item><item><title>Winter Wonderland</title><dc:creator>Jeff Murchison</dc:creator><pubDate>Sat, 13 Feb 2010 18:39:49 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/2/13/winter-wonderland.html</link><guid isPermaLink="false">367531:3946913:6679948</guid><description><![CDATA[<p><span class="full-image-block ssNonEditable"><span><a href="http://www.sorbawoodstock.org/photos/snow-feb-2010/"><img style="width: 620px;" src="http://www.sorbawoodstock.org/picture/snow.jpg?pictureId=4458017&amp;asGalleryImage=true&amp;__SQUARESPACE_CACHEVERSION=1266086583623" alt="" /></a></span></span></p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6679948.xml</wfw:commentRss></item><item><title>Snow Ride</title><dc:creator>Jeff Murchison</dc:creator><pubDate>Sat, 13 Feb 2010 01:12:21 +0000</pubDate><link>http://www.sorbawoodstock.org/blankets-creek-news/2010/2/12/snow-ride.html</link><guid isPermaLink="false">367531:3946913:6668032</guid><description><![CDATA[<p>The trails will be open Feb 13th for a snow ride, this will be one day only so everyone can enjoy.</p>]]></description><wfw:commentRss>http://www.sorbawoodstock.org/blankets-creek-news/rss-comments-entry-6668032.xml</wfw:commentRss></item></channel></rss>